Building drain passing through exterior

Discussion in 'IPC Plumbing Code Questions' started by ransonjd, Mar 14, 2017.

  1. ransonjd

    ransonjd New Member

    Joined:
    Jan 22, 2017
    Location:
    New York
    My house is going to be built on a U-shaped monolithic-slab-on-grade that wraps around a courtyard. The house will be on a septic. I'm planning out the plumbing for permitting and quoting.

    The shortest route for the building drain would pass through the courtyard. I've attached an image that shows the building drain routing. The top pipe goes to the septic. (I haven't added the fixtures on the right half of the house yet.

    Are there any code issues with having the building drain exit and re-enter the structure, assuming it's adequately deep to prevent freezing?
     

    Attached Files:

Similar Threads: Building drain
Forum Title Date
IPC Plumbing Code Questions Minimum Restroom Requirements In Commercial Building (Mercantile)? Nov 19, 2015
IPC Plumbing Code Questions Reverse Osmosis Saddle Drain on Vent? Feb 2, 2017
IPC Plumbing Code Questions double bathroom sinks and washing machine through 2 inch drain - no vent - okay? Sep 11, 2013
IPC Plumbing Code Questions Venting emergency drain. Feb 4, 2013
IPC Plumbing Code Questions Underslab drain replacement not deep enough for current code Nov 7, 2012

Share This Page