I'm installing a sewage pump system in an existing (but unused) basin that drains a bath and kitchen in a basement. Total lift is 12' from basin floor.
The typical pipe diameter in these systems is 2", and it will eventually tie into an existing 3" DWV pipe after a 20' horizontal run that...