Recent content by seans

  1. S

    2012 UPC + Cleanouts

    Thanks Terry. I omitted the vents from the diagram. We have a vent on the bath trap arm. Unless it was misunderstood, the inspector is requiring us to add a vent between the toilet and where the toilet and tub drains join. I didn't have that originally. To restate part of your answer to...
  2. S

    2012 UPC + Cleanouts

    I'm in Seattle, which adopted 2012 UPC. My drain/waste lines for bathroom are on horizontal branches from the main stack. I have less than 135-degrees of bends, but the toilet terminates a total of about 7' from the main stack, and the tub more than 5' where it branches from toilet drain line...
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks