99k
Radon Contractor and Water Treatment
This is the second time this month where I went to install a water system and found the #4 ground wire from the panel to the copper water distribution line was purposely cut at the grounding clamp. Why would anyone want to do such a thing? In both instances, I noticed a lot of communications equipment in these mechanical areas ... is the issue possibly interference?