Broncomech
New Member
- Messages
- 1
- Reaction score
- 0
- Points
- 0
Does the water heater have to be first from the main supply line, or can I have a bathroom (sink, shower, and toilet) then water heater, then the kitchen and other bathrooms connected. I am finishing my basement and the inspector said the water lines were too close to the circuit breaker panel. It is easier to move the water, but is their any special order that I have to plumb it.