I have a tub I wish to install. There is a drain line from an existing shower I tore out and am replacing and then the 4" main drain and also a toliet drain. Do I have to break the concrete and tie into one of these drains or can this be tied into the main floor drain above the concrete? getting away from the jackhammer is my goal. Any pictures or diagrams greatly appreciated thanks in advance.