Best Way???

Users who are viewing this thread

tallen

New Member
Messages
1
Reaction score
0
Points
0
I have a tub I wish to install. There is a drain line from an existing shower I tore out and am replacing and then the 4" main drain and also a toliet drain. Do I have to break the concrete and tie into one of these drains or can this be tied into the main floor drain above the concrete? getting away from the jackhammer is my goal. Any pictures or diagrams greatly appreciated thanks in advance.
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks