Dlarrivee New Member Messages 1,150 Reaction score 0 Points 0 Location Canada Jan 3, 2010 #1 The chunk of 1.5" pipe at the bottom with the barcode on it after the 90 is where it came through the wall. The rest of it was under the lav in the vanity...
The chunk of 1.5" pipe at the bottom with the barcode on it after the 90 is where it came through the wall. The rest of it was under the lav in the vanity...