Weneedhelp
New Member
What is the correct way to layout the pipe for the Soiree TKS960M set?
I am building a solid frame(2x6) to hold the very heavy brass fixtures.
Water Supply Lines are just below the Top of the Tub and I want the Framing in place before Tub is installed. The opening in the wall approx 22" wide, between 2x4 beams.
Sometimes it is hard to find the words that will fully explain problem.
Hope Pic helps
Thanks
Sey
I am building a solid frame(2x6) to hold the very heavy brass fixtures.
Water Supply Lines are just below the Top of the Tub and I want the Framing in place before Tub is installed. The opening in the wall approx 22" wide, between 2x4 beams.
Sometimes it is hard to find the words that will fully explain problem.
Hope Pic helps
Thanks
Sey
Attachments
Last edited: