I will be redoing my shower in the near future. I currently have an acrylic pan with tile above, which was installed by the builder (1997). Floor construction is tensioned slab on grade. The plan is to use a Schluter pan & curb, and Kerdi drain with Kerdi fabric up the walls. I will probably end up tearing out all the old tile and whatever they used underneath, replacing it with 1/2" Hardiebacker and tile over the Kerdi. (I have John Bridge's Kerdi shower book)
My dilemma is the drain. I have no idea what to expect once I demo the old acrylic shower pan out. Would they have used sand or mud bed under the pan? What will I need to do to be sure the drain line will interface properly with the Kerdi Drain? I see lots of drain products, but few cross-sectional drawings that show what is probably under the pan. Any assistance is greatly appreciated. Thanks
My dilemma is the drain. I have no idea what to expect once I demo the old acrylic shower pan out. Would they have used sand or mud bed under the pan? What will I need to do to be sure the drain line will interface properly with the Kerdi Drain? I see lots of drain products, but few cross-sectional drawings that show what is probably under the pan. Any assistance is greatly appreciated. Thanks