Ok, so plumbers just left me with rough lines.
It's my duty to now patch all the concrete, attach flange, etc...
So he's left me with a 3 in ABS with a Flange attached (not glued) and it sits about 1.5 inches above grade. He says I can saw off bottom part of flange to make it shorter.
But he also said I should sink screws in the concrete (since I am patching) for the flange.
I dont quite get what he meant. You think he means put screws through flange into concrete?? He said use brass.
I still have tile to lay which probably will leave me with 1 inch too high.
Any ideas?
dad
It's my duty to now patch all the concrete, attach flange, etc...
So he's left me with a 3 in ABS with a Flange attached (not glued) and it sits about 1.5 inches above grade. He says I can saw off bottom part of flange to make it shorter.
But he also said I should sink screws in the concrete (since I am patching) for the flange.
I dont quite get what he meant. You think he means put screws through flange into concrete?? He said use brass.
I still have tile to lay which probably will leave me with 1 inch too high.
Any ideas?
dad