Should the Durock overlap the shower pan flange?
Contracter say doesn't need to, actually prefers a gap
between bottom of durock and top of shower pan flange.
Building code inspector (who doesn't inspect this) said
tile cement filling in the gap would be OK.
Currently there's about 1/2 inch gap. Should I worry about this?
Is there no set "code" or correct way to do this?
Contracter say doesn't need to, actually prefers a gap
between bottom of durock and top of shower pan flange.
Building code inspector (who doesn't inspect this) said
tile cement filling in the gap would be OK.
Currently there's about 1/2 inch gap. Should I worry about this?
Is there no set "code" or correct way to do this?