New toilet install..

bigboxer

New Member
Messages
4
Reaction score
0
Points
0
I am installing a new toilet in upper bath, replaced cast iron stack with ABS and was wondering.. If you look at my attached pic... will this work?

Initial slope will be 1/4" per ft. than a 45% drop to stack, total about 5ft from stack...

DO you see any problems with this??

small.jpg
 
Vent is too the left....

Larger pic, vent to left 3" running to roof of bungalow..
Upstairs toilet waste to main vent stack

bigboxer-02.jpg


Previous mess that I fixed with new ABS stack..
Should be a shielded coupling here on the stack.

mission_bandseal.jpg



bigboxer-01.jpg
 
Last edited by a moderator:
Back
Top