I have a 3 inch copper waste line that goes directly in to the slab foundation from the second floor. i would like to remove everything above the slab and replace it with pvc. what is the best way to transition from the copper to pvc. Also is it okay to only run a 2 1/2 inch vent that will be 4 1/2 feet from the closet flange?