aperradon
06-29-2007, 05:25 PM
hi there with information from here now i know the jet assemble must be at 10 or 20 ft under line. now i want to know how long can put pipe atached to jet bottom ,the well is 150 ft deep but i want water temporaly like 50 or 60 ft can some help me ?
speedbump
06-30-2007, 06:46 AM
Are you talking about a packer jet in a deep well application?
bob...
The jet can only lift the water about 27' and at that point the flow would be minimal. The closer the jet is to the operating level of the water in the well the better, but the drop pipe from the jet should be at least 30' so the pump cannot physically start pumping air if the water drops too low.