sewage ejector system dilemna

vmplumbing

In the Trades
Messages
25
Reaction score
0
Points
0
Location
California
hello!!

i took a look at a sewage system problem yesterday. the complaint was a possible check valve sticking open, allowing material to fall back into the tank and causing the pump to activate more than it should.

when i arrived, i found the check valve installed at a 45 degree angle---since the cv specified "horizontal" i assumed that replacing this and installing a new valve on the horizontal would do the trick.

i activated the pump, and went to where the 4" line exited the building. after the pump shut off, i could hear material moving back the entire 20' length. this tells me that these folks have another problem besides a faulty check valve...

i'm looking to the experts on this forum for opinions. here is a (not to scale--hehe) drawing of the setup

sewageQuestion.gif


the stick figure would be where i was standing when i heard the material flow back. the 20' length of 4" is fairly horizontal until the last third, where there is a visible slope.

thank you for your time.
 
vmplumbing said:
i assumed that replacing this and installing a new valve on the horizontal would do the trick.
Did you do this?

Rancher
 
Hi Rancher!!

No, I haven't begun any repairs/alterations to the system yet. As soon as i heard the material backflowing (at a fairly rapid clip too i might add) I wanted to get some opinions before possibly making a bad situation worse.
 
Back
Top