ruff in
The three piece adds the tub, which is what I think you meant. Ruff-in means whatever the contract says. It could be just the piping under the floor, or all the drainage piping and vents, or all the drainage piping, vents, and water piping. It depends on what you paid for. Each level becomes more expensive, but there is no standard "starting" point.